Kenco-engineering Accu-Rate Pump Setting Gauge Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Pompes Kenco-engineering Accu-Rate Pump Setting Gauge. Kenco Engineering Accu-Rate Pump Setting Gauge User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 2
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
KENCO ACCU-RATE PUMP SETTING GAUGE®
INSTALLATION AND OPERATING INSTRUCTIONS
Install pipe fittings into gauge by rigidly clamping the END PLATE that is to have piping
installed. Tighten the pipe fittings into the threaded connection of this END PLATE.
GLASS SIGHT TUBE will BREAK if the END PLATE is not HELD RIGIDLY to eliminate
any TWISTING.
GAUGE MUST BE INSTALLED SO GRAVITY WILL FILL THE GAUGE.
To check pumping rate, open VALVE “B” to fill the pump setting gauge. When the
gauge is filled, close VALVE “A” for one minute and note the level in the gauge at the
beginning of the test and at the end of the test. Count the number of marks on the rate
scale that the level dropped. This is the pump rate.
58270
(12-22-11)
Vue de la page 0
1 2

Résumé du contenu

Page 1 - (12-22-11)

KENCO ACCU-RATE PUMP SETTING GAUGE® INSTALLATION AND OPERATING INSTRUCTIONS Install pipe fittings into gauge by rigidly clamping the END PLATE that

Page 2

KENCO ACCU-RATE PUMP SETTING GAUGE® Model PSG0180, PSG0404, PSG0720, PSG1620 and PSG2880 Sight Tube Installation Instructions 1. Apply a small amou

Commentaires sur ces manuels

Pas de commentaire